The White Book
Conceptual Design Report for the Upgrading of SESAME to 2GeV
July 2002
- Cover
- Authors and Acknowledgements
- Table of Contents
- Chapter 1 : Introduction
- Chapter 2 : Charactristics of Synchrotron Radiation
- Chapter 3 : Upgrading of BESSY I
- Chapter 4 : Beam Optics
- Chapter 5 : Layout of the Storage Ring
- Chapter 6 : Magnets
- Chapter 7 : Vacuum System
- Chapter 8 : Radio Frequency System
- Chapter 9 : Power Supplies
- Chapter 10 : Diagnostics
- Chapter 11 : Injector
- Chapter 12 : Control System
- Chapter 13 : Site, Building and Infrastructure
The Yellow Book
Conceptual Design Report for the Upgrading of SESAME to 2.5GeV
May 2003
- Cover
- Authors and Acknowledgements
- Table of Contents
- Project Planning
- Chapter 1 : Introduction
- Chapter 2 : Charactristics of Synchrotron Radiation
- Chapter 3 : Upgrading of BESSY I
- Chapter 4 : Beam Optics
- Chapter 5 : Layout of the Storage Ring
- Chapter 6 : Magnets
- Chapter 7 : Vacuum System
- Chapter 8 : Radio Frequency System
- Chapter 9 : Power Supplies
- Chapter 10 : Diagnostics
- Chapter 11 : Injector
- Chapter 12 : Control System
- Chapter 13 : Site, Building and Infrastructure
- Chapter 14 : Radiation Shielding
Tab