SESAME is the first synchrotron light source in the Middle East and neighbouring countries. It is located in Allan (Jordan). The facility was officially inaugurated in May 2017. It consists of a 20 MeV Microtron, an 800 MeV Booster synchrotron and a 2.5 GeV electron storage ring. Three beamlines are in operation and hosting users. They are the XAFS/XRF (X-ray Absorption Fine Structure/X-ray Fluorescence) spectroscopy beamline, the IR (Infrared) spectromicroscopy beamline and the ID09 - MS/XPD (Materials Science/X-ray Powder Diffraction) beamline. Two further beamlines (for X-ray tomography and soft X-ray spectroscopy) are being constructed and are expected to come into operation in 2022. This suite of five beamlines, from the seven planned for Phase I, will allow world-class research in virtually all fields of science.
SESAME is seeking a Power Supplies Engineer with a B.Sc. degree in Electronics Engineering or equivalent who has excellent understanding of EMC and EMI suppression methods. The successful candidate will work under the direct supervision of the technical director.
Submission deadline: Submission will remain open until a suitable candidate is found.